Loading NuWatt Energy...
We use your location to provide localized solar offers and incentives.
We serve MA, NH, CT, RI, ME, VT, NJ, PA, and TX
Loading NuWatt Energy...
NuWatt designs, installs, and manages solar, battery, heat pump, and EV charger systems across 9 states. One company, one warranty, one point of contact.
Get a Free QuoteCommercial-grade rapid charging for businesses and fleets
$35,000-$200,000 installed · 3-20 miles/minute · Eversource Energy (Eastern MA) at $0.27/kWh
DC Fast Charging
Equipment + installation
Total Cost
$35,000-$200,000
Charging Speed
3-20 miles/minute
Utility Rate
$0.27/kWh
Commercial ITC
30%
Licensed Electricians — NuWatt installs commercial DC fast chargers in Chelmsford, MA. Full permitting included.
DC fast chargers deliver 480V+ (3-phase) three-phase power at 100-500A, adding 3-20 miles/minute of range. A typical session charges an EV to 80% in 15-45 minutes (80%), making them essential for commercial locations, fleet depots, and public charging corridors near Chelmsford, MA.
Equipment costs range from $25,000-$150,000, with installation running $10,000-$50,000 depending on existing electrical infrastructure. Commercial installations in Massachusetts qualify for the 30% federal Investment Tax Credit under Section 48/48E, plus MACRS depreciation (20% bonus in 2026). The NEVI program also provides federal grants for public DC fast chargers along designated corridors.
At Eversource Energy (Eastern MA)'s commercial rate, operators can set competitive per-kWh pricing while generating revenue. NuWatt handles site assessment, utility coordination with Eversource Energy (Eastern MA), equipment procurement, installation, and all permitting in the Chelmsford area.
Leading commercial DC fast charging stations for businesses and public deployment.
30% federal investment tax credit for commercial EV charger installations. Additional adders possible for domestic content (+10%) and energy communities (+10%).
National Electric Vehicle Infrastructure program funds public DC fast chargers along designated corridors. Up to 80% of project costs may be covered.
5-year MACRS accelerated depreciation with 20% bonus depreciation in 2026. Drops to 0% in 2027.
Equipment
DC fast charging station hardware
Installation
Electrical work, trenching, 3-phase wiring
Permitting
Local permits and Eversource Energy (Eastern MA) interconnection
Level 2 Home Charger
$900-$2,300
30% commercial ITC available. NEVI funding for public chargers. Free site assessment in Chelmsford.
Get My Quote