Loading NuWatt Energy...
We use your location to provide localized solar offers and incentives.
We serve MA, NH, CT, RI, ME, VT, NJ, PA, and TX
Loading NuWatt Energy...

ChargePoint
12 kW
50A
J1772
23 ft
| Max Output | 50A / 12 kW |
| Connector | J1772 |
| Cord Length | 23 ft |
| Plug Options | NEMA 14-50, Hardwired |
| Install Location | Indoor / Outdoor |
| UL Listed | Yes |
| ENERGY STAR | Yes |
| Warranty | 3-year limited warranty |
| Rating | 9/10 |
| Smart Features | App control, Scheduling, Energy tracking, Reminders |
| Voice Assistants | Alexa, Google Assistant |
See how the ChargePoint Home Flex performs with popular electric vehicles. Effective speed depends on each car's onboard charger limit.
| Vehicle | Effective kW | Miles/Hour | 0-100% | 20-80% | Adapter? |
|---|---|---|---|---|---|
| Tesla Model Y Long Range | 11.5 kW | ~48 mi | 6.3h | 3.8h | Yes |
| Tesla Model 3 Long Range | 11.5 kW | ~55 mi | 6.3h | 3.8h | Yes |
| Hyundai Ioniq 5 | 11 kW | ~43 mi | 6.7h | 4h | Yes |
| Tesla Cybertruck | 11.5 kW | ~32 mi | 10.3h | 6.2h | Yes |
| Ford Mustang Mach-E | 10.5 kW | ~36 mi | 8.4h | 5h | Yes |
| Ford F-150 Lightning | 12 kW | ~29 mi | 10.5h | 6.3h | Yes |
| Chevrolet Equinox EV | 11.5 kW | ~43 mi | 7.1h | 4.3h | Yes |
| Kia EV6 | 11 kW | ~44 mi | 6.7h | 4h | Yes |
| Tesla Model S | 11.5 kW | ~47 mi | 8.3h | 5h | Yes |
| Chevrolet Blazer EV | 11.5 kW | ~37 mi | 8.5h | 5.1h | Yes |
| Chevrolet Silverado EV | 12 kW | ~28 mi | 16h | 9.6h | Yes |
| Hyundai Ioniq 6 | 11 kW | ~51 mi | 6.7h | 4h | Yes |
ChargePoint Home Flex vs Tesla Wall Connector
12 kW / $699 vs 11.5 kW / $475
ChargePoint Home Flex vs Enel X JuiceBox 40
12 kW / $699 vs 9.6 kW / $649
ChargePoint Home Flex vs Wallbox Pulsar Plus
12 kW / $699 vs 11.5 kW / $649
ChargePoint Home Flex vs Emporia Smart Charger
12 kW / $699 vs 11.5 kW / $449
ChargePoint Home Flex vs Autel MaxiCharger
12 kW / $699 vs 12 kW / $659
ChargePoint Home Flex vs Grizzl-E Classic
12 kW / $699 vs 9.6 kW / $399
ChargePoint Home Flex vs Tesla Universal Wall Connector
12 kW / $699 vs 11.5 kW / $595
Our licensed electricians handle everything from panel upgrades to final commissioning. Typical install takes 2-4 hours.