Bangor solar costs $2.91-$3.15/W (~$27,270 for 9 kW). Versant Power's higher rate ($0.32/kWh vs CMP's $0.27) means each kWh of solar is worth more, giving Bangor a ~13 year payback vs ~16 years in Portland. $3,456/year in NEB credits.
$3.03/W
Avg Cost
$27,270
9 kW System
$0.32
Versant (/kWh)
$3,456
NEB/Year
~13 yr
Payback
Bangor homeowners in Versant Power territory actually get a better solar deal than Portland homeowners in CMP territory. Higher electricity rates mean more valuable NEB credits and faster payback.
| Metric | Bangor (Versant) | Portland (CMP) | Why It Matters |
|---|---|---|---|
| Electricity Rate | $0.32/kWh (Versant) | $0.27/kWh (CMP) | Higher rate = more valuable NEB credits |
| Annual NEB Value (9 kW) | $3,456 | $2,916 | $540 more per year in Bangor |
| Cash Payback | ~13 years | ~16 years | 3 years faster in Bangor |
| 25-Year Savings | $65,000-$95,000+ | $55,000-$80,000+ | $10K-$15K more in Bangor |
| System Cost (9 kW) | ~$27,270 | ~$27,630 | Slightly lower cost in Bangor |
Despite being farther north, Bangor solar pays back approximately 3 years faster than Portland because Versant rates are $0.05/kWh higher. Over 25 years, this translates to $10,000-$15,000 more in total savings. The higher Versant rate more than compensates for any minimal difference in solar production between the two cities.
| Component | Cost Range |
|---|---|
| Solar panels (9 kW) | $9,700-$11,400 |
| Inverter(s) | $2,400-$3,800 |
| Mounting and racking | $1,900-$2,900 |
| Electrical work and wiring | $2,400-$3,400 |
| Permitting and interconnection | $500-$1,000 |
| Labor and installation | $4,800-$6,800 |
| Design, engineering, overhead | $2,900-$4,300 |
| Total (before incentives) | $26,190-$28,350 |
Section 25D expired December 31, 2025. Bangor homeowners pay full system cost with $0 federal tax credit.
100% property tax exemption + 5.5% sales tax exemption. Saves approximately $1,500 on a $27,270 system.
10,800
kWh/year production
$3,456
Annual NEB credits
~13 yrs
Cash payback
System cost: $27,270
Year 1 NEB value: $3,456
Versant rate increase: 5-6%/year
Payback (cash): ~13 years
25-year savings: $65,000-$95,000+
ROI after 25 years: 140-250%
Take advantage of Versant's higher rates for faster solar payback. Free assessment with Versant-specific NEB calculations.