Loading NuWatt Energy...
We use your location to provide localized solar offers and incentives.
We serve MA, NH, CT, RI, ME, VT, NJ, PA, and TX
Loading NuWatt Energy...
Use the free estimator for a preliminary layout, or share your preferred response method with the commercial team. Final feasibility still requires site, utility, and engineering review.

A 168-module rooftop system for a Boston community development organization on an occupied building.
Image: 2025 Massachusetts statewide orthoimagery, MassGIS
Project brief
NuWatt completed a 59.64 kW solar project with 168 modules at Dorchester Bay Economic Development Corporation in Dorchester, Boston, MA, in 2018. The documented mounting system is PanelClaw Polar Bear III HD ballasted. The project was delivered under a Third-party PPA structure.
Design response
Complete the electrical tie-in while an occupied community-development building stayed in service.
Schedule portions of the work overnight and use a non-penetrating ballasted roof design.
At a glance
On site
Installation photography and site context from the project record.
Aerial contextNuWatt completed a 59.64 kW solar project with 168 modules at Dorchester Bay Economic Development Corporation in Dorchester, Boston, MA, in 2018. The documented mounting system is PanelClaw Polar Bear III HD ballasted. The project was delivered under a Third-party PPA structure.
The 168-module ballasted layout was coordinated around an occupied building and an overnight electrical tie-in.
The documented mounting system is PanelClaw Polar Bear III HD ballasted on Flat membrane roof.
Use the roof estimator to begin with the building, roof constraints, and usable area before requesting a full engineering assessment.