Loading NuWatt Energy...
We use your location to provide localized solar offers and incentives.
We serve MA, NH, CT, RI, ME, VT, NJ, PA, and TX
Loading NuWatt Energy...
Use the free estimator for a preliminary layout, or share your preferred response method with the commercial team. Final feasibility still requires site, utility, and engineering review.

A solar-ready school roof converted into a serviceable, non-penetrating commercial array.
Project brief
NuWatt completed a 24.885 kW solar project with 79 modules at Epiphany School in Dorchester, Boston, MA, in 2018. The documented mounting system is PanelClaw Polar Bear III HD ballasted. The project was delivered under a Third-party PPA structure.
Design response
Install on an active school while preserving future access to roof and mechanical equipment.
Use a non-penetrating ballasted array and retain service routes with protective walkway pads.
At a glance
On site
Installation photography and site context from the project record.
Project photographyNuWatt completed a 24.885 kW solar project with 79 modules at Epiphany School in Dorchester, Boston, MA, in 2018. The documented mounting system is PanelClaw Polar Bear III HD ballasted. The project was delivered under a Third-party PPA structure.
The final permit set documents 79 modules, SolarEdge inverters, and a PanelClaw ballasted layout.
The documented mounting system is PanelClaw Polar Bear III HD ballasted on White TPO membrane.
Use the roof estimator to begin with the building, roof constraints, and usable area before requesting a full engineering assessment.