Loading NuWatt Energy...
We use your location to provide localized solar offers and incentives.
We serve MA, NH, CT, RI, ME, VT, NJ, PA, and TX
Loading NuWatt Energy...
NuWatt designs, installs, and manages solar, battery, heat pump, and EV charger systems across 9 states. One company, one warranty, one point of contact.
Get a Free QuoteSide-by-side comparison based on specs, real pricing, and our crew's installation experience. Updated for 2026.



$5,000-8,000 installed
$2,000-4,000 installed


Lumin installs alongside your existing electrical panel — no panel swap required. Our electricians wire the circuits you want to manage through the Lumin module, typically in 3-4 hours. This is a big advantage over SPAN when the existing panel is in good shape and doesn't need replacement. We select the 12-18 most important circuits (fridge, lights, well pump, HVAC, etc.) for smart management. The app-based control works well, though we miss SPAN's built-in touchscreen.
Traditional panel upgrades are straightforward for our electricians. The install takes 4-6 hours including utility coordination for the meter disconnect. For solar + battery systems, we add a transfer switch (automatic or manual) which adds 2-3 hours. This is the cost-effective choice when per-circuit smart control isn't a priority.
Our energy advisors help you pick the right equipment based on your home, energy usage, and budget. Free consultation — no obligation.