Loading NuWatt Energy...
We use your location to provide localized solar offers and incentives.
We serve MA, NH, CT, RI, ME, VT, NJ, PA, and TX
Loading NuWatt Energy...
Backup power, peak shaving, and energy independence for Gilbertville homeowners. ConnectedSolutions program available.
Battery Overview
Program
ConnectedSolutions
N/A
Hardwick Electric Department
8 hrs/yr
Massachusetts
$275/kW/year
ConnectedSolutions
Gilbertville, Massachusetts homeowners are adding battery storage to protect against power outages, reduce peak electricity costs, and maximize solar savings. The local utility, Hardwick Electric Department, charges $0.15/kWh for residential electricity. With Massachusetts averaging 8 hours of outages per year, a home battery provides critical backup power when the grid goes down.
Gilbertville homeowners enrolled in ConnectedSolutions earn $275/kW/year by dispatching stored energy during peak demand events. This demand response revenue can offset a significant portion of your battery investment over its lifetime, turning your battery into a revenue-generating asset in addition to a backup power source.
The federal residential energy storage tax credit (Section 25D) expired December 31, 2025. Homeowners purchasing batteries with cash or a loan no longer receive any federal tax credit. The ConnectedSolutions is the key state-level program for Gilbertville — connectedsolutions demand response pays $275/kw/year for peak shaving.
NuWatt Energy installs battery storage systems directly in Gilbertville — no subcontractors. We handle the full process: load assessment, battery sizing, installation, interconnection with Hardwick Electric Department, and all incentive applications. Pair with solar to charge your battery with free energy from your roof.
Expired December 31, 2025. Previously 30% for residential battery storage. No longer available for homeowner purchases.
ConnectedSolutions demand response pays $275/kW/year for peak shaving.
Earn revenue by dispatching stored energy during peak demand events. Annual payments for the life of the program.
NuWatt installs these leading battery systems in Gilbertville, Massachusetts.
+ 287 more towns in Massachusetts