Loading NuWatt Energy...
We use your location to provide localized solar offers and incentives.
We serve MA, NH, CT, RI, ME, VT, NJ, PA, and TX
Loading NuWatt Energy...
NuWatt designs, installs, and manages solar, battery, heat pump, and EV charger systems across 9 states. One company, one warranty, one point of contact.
Get a Free Quote
Product image: Siemens. Used for identification only.
VersiCharge is a family of AC chargers, not a single 30-amp consumer specification. Match the regional model, rated current and commercial control options to the site before comparing equipment.
| Charger type | Level 2 AC; generation and regional model matter |
| Current reference family | VersiCharge 48 A AC / VersiCharge Blue 48 A AC |
| Supply reference | 208/240 V AC single phase for the US 48 A family |
| Output selection | Configurable current; do not exceed model and site limits |
| Vehicle connection | J1772 in the referenced US 48 A documentation |
| Cable | 20 or 25 feet depending on the referenced variant |
| Commercial networking | OCPP implementation documented; verify order number and firmware |
| Integration | Backend testing and commissioned configuration required |
| Warranty and stock | Obtain current written terms for the specific unit |
Coordinate charger controls with the electrical design and facility operating rules. Existing Siemens switchgear does not by itself prove capacity or automatic integration.
Confirm driver authentication, software ownership and backend acceptance for the selected commercial variant. Test the intended operating workflow before rolling out multiple ports.
Compare the residential configuration with the actual household vehicles and available circuit. Do not substitute a legacy consumer model for a managed commercial specification.
| Line item | Scope to confirm |
|---|---|
| Equipment selection | Exact model, amperage, connector and mounting accessories |
| Electrical work | Capacity review, circuit route, protection and any panel/service changes |
| Site preparation | Permits, inspection, wall or pedestal mounting and any trenching |
| Operating configuration | Access control, connectivity, optional meters and confirmed software fees |
| Commissioning and upkeep | Configuration, testing, owner handover and maintenance responsibilities |
| Project total | Site-specific written quote |
No verified installed-price range is published here. Request equipment, construction, software and recurring service costs separately. Scope depends on the site, selected configuration and written exclusions; no savings or incentive award is assumed.
Section 30C is unavailable for property placed in service after June 30, 2026. For qualifying property placed in service from January 1, 2023 through that date, the residential credit was 30% with a $1,000 limit per item at a main home. The business credit was 6%, or 30% when applicable prevailing-wage and apprenticeship requirements were met, with a $100,000 limit per item. Eligible location and other requirements still apply. The IRS defines an item as each charging port, fuel dispenser or storage property—not automatically an entire cabinet or household. Confirm historical eligibility and cost allocation with a tax adviser before filing Form 8911. Do not assume state or utility funding is available for a particular model or site. IRS guidance (opens in a new tab).
Full Section 30C commercial guide
Distinguish Leviton smart-home equipment from commercial product families and software.
View spec
Review this charging option against the need for managed access, billing and current product support.
View spec
Compare 40 A and 48 A configurations, energy-management accessories and commercial operating requirements.
View specRequest a site-specific VersiCharge review covering the exact hardware, backend acceptance, electrical work and operating responsibilities.
Source check: 2026-09-14. Manufacturer and, for legacy equipment, successor-service references were reviewed for this guide. This is not NuWatt installation-history evidence, a stock confirmation, a warranty commitment or a verified installed-price offer.
External reference links open a new tab and leave NuWatt. Use the NuWatt quote links above for project assistance.