Loading NuWatt Energy...
We use your location to provide localized solar offers and incentives.
We serve MA, NH, CT, RI, ME, VT, NJ, PA, and TX
Loading NuWatt Energy...
NuWatt designs, installs, and manages solar, battery, heat pump, and EV charger systems across 9 states. One company, one warranty, one point of contact.
Get a Free Quote
Product image: Enel X. Used for identification only; NuWatt is not affiliated with Enel X.
40A Level 2 with the JuiceNet managed-charging cloud. A workhorse for workplace and light commercial where demand-response revenue matters.

| Charger type | Level 2 (AC) |
| Max amperage | 40 A |
| Max power output | 9.6 kW @ 240 V |
| Range per hour | ~28 miles/hour at 40 A |
| Connector | SAE J1772 |
| Networked | Yes — JuiceNet cloud + OCPP 1.6J |
| OCPP version | OCPP 1.6J (select commercial models) |
| Wi-Fi / cellular | Wi-Fi + Bluetooth |
| NEMA rating | NEMA 4 (indoor/outdoor) |
| Cable length | 25 feet |
| Warranty | 3 years |
| Made in | USA (designed CA / assembled abroad) |
JuiceNet dashboard simplifies session tracking across 10–50 ports. Managed charging (VPP and demand response) pairs well with Eversource programs.
JuiceNet integrates with solar-aware charging — delays sessions to midday when rooftop generation peaks, trimming utility bills.
Car dealerships and small fleets with 4–12 ports. Low cost per port makes it attractive when budgets are tight.
| Line item | Typical range |
|---|---|
| Hardware (MSRP) | $619 – $719 |
| Permits & inspection | $120 – $350 |
| Labor (licensed electrician) | $650 – $1,150 |
| Make-ready (wire, breaker) | $250 – $650 |
| JuiceNet Enterprise subscription | $19 – $35/port/month |
| All-in single-port install | $1,600 – $2,400 |
Managed-charging revenue through ConnectedSolutions can offset $5–$40/plug/month during the June–September season, partially covering the JuiceNet subscription.
Residential Section 30C credit up to 30% of cost, capped at $1,000 per household applies when installed in an eligible census tract. Workplace and commercial deployments fall under the business credit framework — details in the full guide.
Full Section 30C commercial guide
Same platform, 48 A (vs 40 A) — +$100 for 20% more power. Pick for vehicles that accept 11+ kW.
View spec
Same 40 A, newer OCPP support, more reliable cloud in 2024–2025. ~$30 more.
View spec
50 A, larger app/network ecosystem. Better pick if managed-charging revenue isn't a priority.
View specNuWatt handles the ConnectedSolutions enrollment, JuiceNet commissioning, and utility make-ready application end-to-end.
Last verified by NuWatt Engineering Team on 2026-04-14. Specs reflect the 2026 Enel X datasheet. Installed cost ranges reflect NuWatt project data.